অসমীয়া   বাংলা   बोड़ो   डोगरी   ગુજરાતી   ಕನ್ನಡ   كأشُر   कोंकणी   संथाली   মনিপুরি   नेपाली   ଓରିୟା   ਪੰਜਾਬੀ   संस्कृत   தமிழ்  తెలుగు   ردو

Irrigation

What to Do?

  • Conserve soil and water through Good Agricultural Practices.
  • Harvest rain water through construction of check dams and ponds.
  • Adopt crop diversification, seed production and nursery raising in water logged areas.
  • Adopt drip and sprinkler irrigation system to save 30-37% water and enhance crop quality and productivity.

What Can You Get?

S.NoType of AssistanceQuantum of AssistanceScheme / Component
GOIGOG
1Water Carrying Pipes  -- 2 maximum limit Two hacters25/- per meter or 50% of the cost, whichever is less, with maximum limit of 600 meters and costing ` 15,000/-NFSM NMOOP--
2Open pipe line 50% of cost or Rs. 4500/ha.,
--
AGR – 2
3
75% of cost or 6750 Rs. whichever is less , with limit of Rs.13500--
AGR – 3,4
4Drip Irrigation System for Oil PalmAs per the specification of National Mission for Sustainable Agriculture (NMSA)NMOOP--
5Sprinkler Set for pulses and wheat10,000/- per hectare or 50% of the cost whichever is less.NFSM--
(a) Construction of new Farm Ponds with lining to reduce the percolation losses40,000/- per pond of 20m x 20m x 3m for construction and 40,000/- for lining purposeNMOOP--
(b) Water Harvesting Structures/ponds50% of the cost limited to ` 75,000/- for plains and 90,000/- for hilly areas including lining

6Supply of Diesel Pump-sets for oil Palm Growers50% of the cost limited to 15,000/- per pump set up to 10 HP as per norms of Sub Mission on Agricultural Mechanization (SMAM)NMOOP--
7Bore Well for Oil Palm growers50% of the cost limited to ` 25,000/- per unitNMOOP--
8Pump Set up to 10 HP10,000/- per pump set or 50% of the cost whichever is less.NFSM--
9Water Harvesting System for individuals50% of cost (Construction cost 125/- for plain / 150/- per cu m for hilly areas) limited to 75,000/-, for plain areas and ` 90,000/- for hilly areas including lining. For smaller size of the ponds/dug wells, cost admissible on pro rata basis. Cost for non-lined ponds/tanks will be 30% less.NMSA--
10Water lifting Devices (Electric, Diesel, Wind/ Solar)50% of the cost of installation limited to 15,000/- per electric/diesel unit and 50,000/- per solar/wind unit.NMSA--
11Electric motor

3.0 HP75% of cost or in limit of Rs.8600--
AGR – 2,3,4

5.0 HP75% of cost or in limit of Rs.9750--

7.5 HP75% of cost or in limit of Rs.12,900--
12Oil engine

3.0 to 3.5 HP75% of cost or in limit of Rs.8700--
AGR – 2,3,4

5.0 HP75% of cost or in limit of Rs.12,000--

7.5 to 8.0 HP75% of cost or in limit of Rs.13,500--

10.00 HP75% of cost or in limit of Rs.13875--
13Submersibal pump set

3.0 HP75% of cost or in limit of Rs.15,750--
AGR – 2,3,4

5.0 HP75% of cost or in limit of Rs.22,350--

7.5 HP75% of cost or in limit of Rs.27,975--

10.0 HP75% of cost or in limit of Rs.33,525--
14Under ground pipe line (RCC) rocky land (15 m. X 150 mtr.)75% of cost or in limit of Rs.9000--
AGR – 2,3,4

Alluvial area (15 m. X 200 mtr.)75% of cost or in limit of Rs.12300--
15Under ground pipeline (RCC and PVC)

Rocky land (110 mm X150 mtr.)75% of cost or in limit of Rs.10700--
AGR – 2,3

Rocky land (90 mm. X 150 mtr.)75% of cost or in limit of Rs.8450--

Alluvial area (110 mm. X 200 mtr.)75% of cost or in limit of Rs.14250--

Alluvial area (90 mm X 200 mtr.)75% of cost or in limit of Rs.11,205--

Whom to Contact ?

District Agriculture Officer / District Soil Conservation Officer / Project Director, ATMA.

Source: Department of Agriculture & Cooperation



© 2006–2019 C–DAC.All content appearing on the vikaspedia portal is through collaborative effort of vikaspedia and its partners.We encourage you to use and share the content in a respectful and fair manner. Please leave all source links intact and adhere to applicable copyright and intellectual property guidelines and laws.
English to Hindi Transliterate